Hi all,
Have used VMware Converter for some machines with fine results.
Some servers sadly fails with: "Unable to find the system volume, reconfiguration is not possible" at 97% completed.
It should be current VMware Converter build, the version I uses is: 6.2.0 build 8466193
I'm using the setup where i've selected the possibility to synchronize after the first P2V have run.
The weird thing is, if I boot the VM that is converted it boots fine and looks okay!
The problem is I cannot select the "Synchronize" on the job after it fails, so need to rerun the whole P2V again.
Any throught/help?